System Architecture
Grid / Solar → Franklin ESS → Kora Smart Panel → Home Loads
Installation Notes
• Follow Franklin inverter and ESS installation manuals
• Land ESS output conductors on designated breaker
• Verify grounding and neutral configuration
• Do not attempt to bypass Franklin controls
What Kora Manages
• Circuit-level backup priorities
• Load shedding during outages
• Net energy monitoring
Verification
• Battery charging and discharging confirmed
• Smart Panel reflects correct load behavior
• Outage simulation passes
