Code Reference (NEC)
Code Reference (NEC)
NEC 702 – Optional Standby Systems
NEC 705 – Interaction with distributed generation
NEC 230 / 225 – Service vs feeder distinctions
Partial-Home Backup
Only selected circuits backed up
Longer runtime for critical loads
Common for retrofits or limited battery capacity
Whole-Home Backup
All circuits backed up
Requires sufficient battery and inverter capacity
Load shedding handled dynamically by Kora
Installer Responsibility
Verify inverter output limits to avoid oversizing critical circuits
Clearly label backed-up circuits
Confirm startup surge compatibility
Test outage behavior during commissioning