Code Reference (NEC)
Code Reference (NEC)
NEC 705 – Interconnected Electric Power Production Sources
NEC 690.12 – Rapid Shutdown (PV-side, inverter dependent)
NEC 705.12 – Load-side interconnections
NEC 110.3(B) – Installation per listing and instructions
Requirements
UL 1741 SA listed inverter
PV breaker ≤ 100A
Utility interconnection approval completed
Installation Steps
Install the PV Breaker
Install the PV breaker in the designated AC-PV breaker slot
Do not relocate or substitute breaker positions
Land Inverter Conductors
Terminate inverter output conductors at the PV breaker
Verify conductor sizing per inverter specifications
Torque terminals to manufacturer requirements
Current Transformer (CT) Installation
Install PV CTs
Install PV CTs on the inverter output conductors
Use only the provided or approved CTs
CT Orientation
Orient CT arrows toward the Smart Panel
Ensure CTs are fully closed and latched
CT Lead Routing
Route CT leads through the low-voltage channel only
Do not run CT wiring alongside high-voltage conductors
Verification and Commissioning Checks
App Verification
Confirm PV production is visible in the Kora app
Electrical Verification
Validate CT polarity
Verify no overcurrent conditions